Service Bulletins

 

SERVICE BULLETIN LIST 

 

 

 

 

 

Doc. No. 

Description 

Rev. 

Date 

Downl. 

OSB42-001/2 

Retrofit installation of design changes 

2

2006-05-12 

SB42-002 

 

-

N/A

MSB42-003 

Thielert Software m2.7 

-

2005-04-30 

MSB42-005 

One engine inoperative climb/decent performance data 

-

2005-08-08 

N/A

MSB42-006/1 

Exchange of the safety walk on the wing stubs 

1

2005-09-20 

MSB42-007/10

Software for TAE engine 

10

2011-11-11

MSB42-008/13

Software for Garmin G1000 

13

2011-01-17

OSB42-009 

Cargo door hinges 

-

2006-03-23 

MSB42-010/1 

Relocation of Configuration Module, KCM 100 

1

2005-11-09 

OSB42-013 

Installation of an auxiliary fuel tank 

-

2006-02-02 

OSB42-014/4 

Increase of maximum take off mass 

4

2006-04-18 

OSB42-015/4

Installation of ice protection system 

4

2008-03-27

MSB42-016/2 

Installation Improved Breather Line 

2

2007-02-14 

MSB42-017 

Oil lines 

-

2006-02-21 

OSB42-018 

Installation of a WX-500 Stormscope 

-

2006-02-22 

MSB42-019/4 

Exchange of the Auxiliary Fuel Tank check valve and installation of additional filter 

4

2006-08-01 

OSB42-020 

Improvement of heating system 

-

2006-06-21 

MSB42-021 

Inspection of clearance of exhaust pipe 

-

2006-06-13 

OSB42-023 

Optional retrofit installation of an oxygen system 

-

2006-07-25 

MSB42-024/3 

Installation of Propeller System Check valve Bracket 

3

2006-09-19 

RSB42-025 

Improved Fuel Probe 

-

2006-10-02 

MSB42-027/1

Engine Controls - Electrical Harness, incl. WI Rev. 2

1

2007-02-14 

MSB42-028 

Engine Controls - Electrical Harness - Sealant 

-

2006-10-02 

RSB42-029 

Installation of Additional Positioning Pins for the Canopy 

-

2006-09-27 

MSB42-030/2

Check of return fuel line installation on Common Rail

2

2006-12-20

MSB42-031/1

Inspection and repair of MLG brace rib

1

2007-04-05

MSB42-032/1

Auxiliary Fuel Tank, Ventilation Hole, Inspection

1

2007-01-24

MSB42-035

Coolant Tank Cap  Pressure Relieve Test (inkl. WI Rev. 1)

-

2006-12-07

RSB42-036

Installation of a Water Separator in the MAP-Lines of the ECU

-

2007-02-08

MSB42-038/2

Installation of a Modified Water Tube Bracket

2

2007-07-26

MSB42-039

Installation of a Redesigned Breather Line and a New Oil Separator

-

2007-03-26

OSB42-040

Installation of ECU P/N 02-7610-55181R1

-

2007-03-28

RSB42-041/1

Welding reinforcement of the cabin heat exchanger (RH-engine) and defrost heat exchanger (LH-engine), P/N D60-2140-10-00

1

2007-07-26

MSB42-042/1

Installation of additional ECU Backup Batteries
incl. WI-MSB42-042 Rev. 2
incl. EASA-AD No. 2007-
0183 R2

1

2007-08-08

MSB42-043/1

Replacement of aileron bellcrank located in the wing and replacement of a bent rod end

1

2008-04-03

OSB42-046/2

Retrofit of the TAE 125-02-99 engine

2

2011-04-01

OSB42-050/1

Installation of additional ECU Backup Batteries sufficient for at least 30 Minutes Engine Operation
incl. WI-OSB42-050 R2
incl. EASA-AD No. 2007-0183 R2

1

2007-10-15

OSB42-051

Installation of a Comant CI120/GS NAV/LOC/GS Antenna on the vertical fin

-

2007-12-18

MSB42-055

Water Circulation Installation

-

2008-01-10

OSB42-056

Conversion of a Standard DA 42 to a DA 42 M

-

2008-02-28

OSB42-057

Installation of an Additional Exhaust End Pipe

-

2008-05-19

MSB42-058

Wire Secured Bolts for Engine Support TAE125-01 incl. WI Rev. 1

-

2008-05-21

OSB42-061

Import requirements to CIS

-

2011-07-11

MSB42-062/1

Replacement of the Landing Gear - Downlock Pin incl. WI Rev. 1

1

2008-11-13

MSB42-063/1

Inspection and Modifications of the NLG centering unit mount

1

2010-01-22

OSB42-065/1

Installation of an Alternative Main Battery

1

2009-11-27

RSB42-066

Replacement of the check valve at the auxiliary tank (LH & RH) with a solenoid valve

-

2008-12-04

OSB42-068/1

Conversion of DA 42 Aircraft to variant DA 42 NG

1

2010-06-17

MSB42-070/1

Inspection of NLG Tubular Pivot Assembly incl. WI Rev. 2

1

2009-06-24

OSB42-071/1

NG Safety Walk Installation on DA 42 Aircraft (EASA-AD A-2005-003 4. C. i

1

2010-01-08

RSB42-072/2

Application of an approved sealant on the fire sensor or replacement by a sealed fire sensor, incl. WI Rev. 1

2

2010-04-22

MSB42-074/3

Reinforcement of the supporting structure in NLG-Box incl. WI Rev. 2

3

2010-01-29

OSB42-075

Use of Diesel Fuel (EN 590) on DA 42 aircraft

-

2009-09-21

MSB42-076

Sealing of Holes in the Firewall

-

2010-06-07

MSB42-077

Check of emergency exit lever

-

2010-07-14

OSB42-078

Installation of a Coated Safety Walk

-

2010-05-20

RSB42-080

Installation of Suppressor Diodes at the ECU Relays

-

2010-04-02

OSB42-081/1

Conversion of DA 42 M aircraft to variant DA 42 M-NG

1

2010-12-23

OSB42-082

Changing DA 42 M / DA 42 M-NG aircraft from restricted to normal type certification

-

2010-03-17

MSB42-083

Replacement of the passenger door retaining bracket

-

2010-07-13

OSB42-085

Installation of vibration and cabin noise reduction measures in the floor panel

-

2010-10-14

MSB42-087/1

Inspection of rudder control system and NLG steering bracket

1

2010-11-15

MSB42-088/3

Inspection of MLG joint

3

2011-03-08

RSB42-089/1

Replacement of Seals in Main Landing Gear Damper

1

2011-04-19

MSB42-091

Main Landing Gear Bearing Housing

-

2011-06-28

MSB42-092

Center Wing - Skin to Spar Bond, EASA-AD 2011-0100

-

2011-05-20

RSB42-094

Installation of a stiffener on the alternator cable

-

2011-11-22

MSB42-095

Replacement of MLG damper nut

-

2011-11-11